Master bathroom project
December 13, 2011
Recently, we finished a master bathroom project and would like to share some of the ‘after’ snapshots and hauthaus drawings with you, our loyal reader!
Below, you’ll see the floor plan which shows the door to the bathroom is directly off of the bedroom (at the top of the drawing). The tall linen cabinet and double sink vanity are opposite the wall with the free standing bathtub and glass shower enclosure. We included a special make-up area for our client on the other side of the shower. The door at the end of the bathroom leads to the walk-in closet.
finished: Izzy’s bathroom
December 9, 2011
We blogged recently about Izzy’s bathroom and showed you a ‘behind the scenes’ snippet of what went in to building it…
Well now it’s done! Check out the final shots of the bathroom from all angles.