ch-ch-ch-changes

March 5, 2012

Changes are a-happening outside and we don’t mean with the weather!

Exterior changes have been taking place at our Mendota Heights project. We have snapped some pictures of the progress so far…

Below, the top pictures shows the existing exterior in December 2010 when we came to the project. The front door is currently hard to distinguish, so we wanted to redesign the front of the house to make it feel more balanced and more pronounced.

The middle picture shows the progress shot from April last year with the trees in full leaves; you can see a shoot was placed in the upper floor window to make removing the debris easier.

The bottom picture was snapped last week (before the snow!). You can see the new front of the house taking shape.  The screens from the loggia are removed and one of the arches was brought forward to make the front door stand out. The windows on the second floor were repositioned to be centered over the front door.  And all the way on the left side of the picture, you can see the second garage stall that was added.

We’re expecting the full remodel to be completed this spring!

Stay tuned for updates as we snap pictures of the interior…

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: